Project Tembo

Google · Cheyenne, WY · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
41.12, -104.82
Serving utility, source-reported
Black Hills Energy
Operational capacity, source-reported
Not published
Planned capacity, source-reported
2700 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Laramie County approved the project Jan 2026; site work underway at Switchgrass Industrial Park (Hwy 85 south of Cheyenne). Crusoe (original builder) exited June 2026; Tallgrass now works directly with the unnamed DC client

    Underlying source
  2. Under construction

    Google publicly revealed as owner/operator (via subsidiary Jupiter Star Holdings, which replaced Crusoe Energy as builder); project renamed 'Project Tembo'. Capacity confirmed at 2.7GW with potential to scale to 10GW total. Completion targeted 2031.

    Underlying source

Source notes

Switchgrass Industrial Park, Hwy 85 south of Cheyenne, Laramie County - geographically distinct from Meta (Project Cosmo) and Microsoft's Cheyenne campuses. 716-acre campus. Originally announced at 1.8GW as 'Project Jade' with an undisclosed hyperscale client (Crusoe Energy as builder); Crusoe exited June 2026. On 2026-07-08, Google was publicly revealed as owner/operator via subsidiary Jupiter Star Holdings, and the project was renamed 'Project Tembo'; capacity confirmed at 2.7GW with an ultimate ceiling of up to 10GW. The Cheyenne Power Hub on-site natural-gas plant supplies power (Tallgrass Energy; Black Hills Energy co-invested). ~$50B total project figure remains a projection. Completion targeted 2031.

Cheyenne Power Hub natural-gas plant (Tallgrass), scalable toward multi-GW; Black Hills Energy co-invested.