Texas Critical Data Centers (TCDC)

Sharon AI + New Era Energy & Digital (joint venture) · , TX · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
31.87, -102.54
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
250 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Potential to scale beyond 1GW (ceiling, not a confirmed committed figure). Power partners Thunderhead Energy Solutions and Mawgan Capital (behind-the-meter gas generation); GlobeLink providing dark fiber. Phased: first 100MW segment targeted online by December 2026, remaining 150MW roughly 6 months later. Coordinates are approximate (Odessa area).

Hybrid: ERCOT grid interconnection plus a non-binding letter agreement with Thunderhead Energy Solutions for ~250 MW of behind-the-meter gas generation (reciprocating engines + turbines), per New Era Energy / Sharon AI releases.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.