TenKey LandCo Project Lionsgate – Franklin Data Center
TenKey LandCo I LLC · Franklin, KY · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.703, -86.591
- Serving utility, source-reported
- Warren Rural Electric Co-op Corp
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
TenKey LandCo first approaches Franklin; city council and planning commission vote unanimously to reject proposed zoning change; project internally called Project Lionsgate/Blackjack
- Proposed
Franklin Planning & Zoning Commission approves preliminary development plan 3-2 after two prior defeats
Underlying source - Proposed
Citizens group files suit to overturn P&Z approval; TenKey's own lawsuit against Simpson County over land use ordinance ongoing
Underlying source
Source notes
Site: 421 Steele Road (Steele Road near Exit 2 on I-65), Franklin, Simpson County, KY. Coordinates are approximate for that I-65 exit area within Franklin city limits. Three 200,000 sq ft buildings plus on-site natural gas power generation planned. End hyperscaler not publicly identified; Simpson County Judge-Executive Mason Barnes refused to sign NDA and called the pitch full of red flags. Data center opposition became a factor in May 2026 local primary elections in Simpson County. Fix: investment figure corrected from $1.6B to $4.8B — LPM confirms total project is 'nearly $5 billion'; the $1.6B figure in the original record is the per-building cost (each of three 200,000 sq ft facilities costs approximately $1.6B, totaling ~$4.8B).
Sources and provenance
- Second lawsuit filed over proposed data center in Simpson County · source retrieved 2026-07-06
- Data center developer sues Simpson County government over land use ordinance · source retrieved 2026-07-06