SOURCE-LINKED U.S. REGISTRY

TeraWulf AI Data Center Campus, Lansing

TeraWulf · Lansing, NY · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.5453, -76.4968
Serving utility, source-reported
New York State Electric & Gas (NYSEG)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
400 MW
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Cayuga Operating Company (TeraWulf affiliate) signs 80-year lease on 183-acre former Cayuga Power Plant site

    Underlying source
  2. Proposed

    Lansing Zoning Board of Appeals rules (December 22) that data center qualifies as permitted general processing land use

    Underlying source
  3. Proposed

    Tompkins County Legislature passes 12-1 resolution urging NYSDEC to reject water withdrawal permit; town debates year-long construction moratorium

    Underlying source

Source notes

Site is the former Cayuga Power Plant (coal-fired, retired). NYSDEC water permit application for Cayuga Lake withdrawal was originally filed in 2021 for 'unspecified future use.' Permit dates to 1955 without modern monitoring requirements per opposition. TeraWulf also has a separate cryptomining operation at the Susquehanna site in PA (Nautilus). Operating entity: Cayuga Operating Company (acquired plant). No status change. The April 2026 DEC water-withdrawal/SPDES action is explicitly for the existing power plant's current operations, not the data center; DEC states it is 'not associated with the proposed data center'. As of the sources fetched 2026-09-09 the project remains proposed and had not cleared local site-plan review. Do not read the water permit as a data-center permit.

Former Cayuga Power Plant (coal) site at 228 Cayuga Drive on Cayuga Lake shoreline; 80-year lease signed August 2025.