TerraVolt Southeast Idaho Data Center Campus (Raft River)

TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.) · , ID · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.5971324, -113.2361093
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-04

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Idaho legislators told BoiseDev that Terra Volt Infrastructure Inc (Tustin, CA) was in talks to develop a master-planned data center campus in Raft River, between Twin Falls and Pocatello. No application was on file.

    Underlying source
  2. Proposed

    CalEthos/TerraVolt signed a firm natural gas supply agreement (55,000 MMBtu/day) for a behind-the-meter on-site power plant at the planned Southeast Idaho campus. The initial phase targets 200-240 MW for data center customers.

    Underlying source

Source notes

Location: the SEC filings say only 'Southeast Idaho on the Northwest Natural Gas Pipeline'. The Raft River siting comes from Idaho legislators quoted by BoiseDev (March 2026); the governor's office referred BoiseDev's questions to Cassia County's economic development agency. The pin is the OpenStreetMap 'Raft River' locality node near I-84/I-86 in Cassia County. It is a representative point only; no parcel has been disclosed. According to the 10-Q, TerraVolt has only a preliminary joint-venture agreement with a landowner. It expects land-use and conditional zone-change approvals by year-end 2026 and construction approvals in Q2 2027. No capacity is recorded because the only stated figure is a 200-240 MW range for the power plant. This is unrelated to the separate CalEthos Lithium Valley record in California.

Behind-the-meter natural gas plant on the Northwest Pipeline, with firm supply of 55,000 MMBtu/day. The initial phase is described as 200-240 MW of power for data center customers; that is a power-plant target, not a measured IT load. The 10-Q (period ended 2026-03-31) reports a $3,832,500 gas reservation fee and a letter of credit of up to $6,000,000. It also says power-plant design and environmental documents were to be submitted to state agencies by mid-2026.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.