SOURCE-LINKED U.S. REGISTRY

Tesla Cortex 2.0 AI Training Cluster (Giga Texas)

Tesla · Austin, TX · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
30.2223, -97.6171
Serving utility, source-reported
Bluebonnet Electric Cooperative
Operational capacity, source-reported
Not published
Planned capacity, source-reported
500 MW
Source record updated
2026-09-21

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Dedicated, purpose-built AI training data center on the north side of Tesla's Giga Texas campus (unincorporated Travis County), separate from and adjacent to the original Cortex cluster. Trains neural networks for Full Self-Driving and the Optimus robot program; uses Nvidia GPUs. First ~250 MW targeted online with a full ~500 MW buildout targeted mid-2026; construction began early 2025. Coordinate is the Giga Texas campus point; Cortex 2.0 is a specific building on that campus.

Grid power from Bluebonnet Electric Cooperative (Giga Texas sits in unincorporated Travis County within Bluebonnet's — not Austin Energy's — service territory) is the primary supply, but Tesla has built genuine on-site generation and storage that make this a defining mixed story.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory