SOURCE-LINKED U.S. REGISTRY

Project Trinity (Teton Digital)

Teton Digital · Tioga, ND · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
48.28, -102.9424
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
100 MW
Source record updated
2026-10-26

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Williams County commissioners authorized Teton Digital to apply for a conditional use permit

    Underlying source

Source notes

100 MW liquid-cooled data center about eight miles south of Tioga, next to the Enerfore Digital site. Phase one was targeted for late 2025, pending approval. No energization or construction confirmation was found, and trackers disagree on status. Coordinates reuse the approximate 8-mi-south-of-Tioga point used for the adjacent Enerfore record.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory