Project Trinity (Teton Digital)
Teton Digital · Tioga, ND · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 48.28, -102.9424
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 100 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Williams County commissioners authorized Teton Digital to apply for a conditional use permit
Underlying source
Source notes
100 MW liquid-cooled data center about eight miles south of Tioga, next to the Enerfore Digital site. Phase one was targeted for late 2025, pending approval. No energization or construction confirmation was found, and trackers disagree on status. Coordinates reuse the approximate 8-mi-south-of-Tioga point used for the adjacent Enerfore record.
Sources and provenance
- Williams County Commissioners give go-ahead for another data center company to apply for a conditional use permit · source retrieved 2026-10-26
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.