Kingston Technology Hub (Thor Equities)
Thor Equities · Kingston, GA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 34.2367172, -84.9450325
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 150 MW
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Development of Regional Impact filed with the Georgia Department of Community Affairs; Thor Equities will ask Bartow County to rezone 559 acres. Completion targeted for 2030.
Underlying source
Source notes
A 350,000 sq ft data center on approximately 559 acres, drawing up to 150 MW at peak, with projected annual tax revenue of $2 million. Rezoning had not been granted at the time of reporting. Coordinates are approximate to Kingston.
Sources and provenance
- Another large data center proposed in Georgia (Thor Equities, Kingston) · source retrieved 2026-09-10
- Thor Equities Plans 150MW Data Center In Georgia, US · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.