SOURCE-LINKED U.S. REGISTRY

TierPoint Omaha - Bellevue Data Center

TierPoint · Bellevue, NE · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
1001 North Fort Crook Road
Coordinates
41.153, -95.925
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Multi-tenant colocation facility at 1001 North Fort Crook Road, Bellevue (Sarpy County): 100,000+ total sq ft with 21,000+ sq ft of raised floor, A-side/B-side power distribution, a 100% uptime SLA, and 10,000 sq ft of business-continuity seating with a 300-seat recovery space. Carrier-class, carrier-neutral, with cloud on-ramps and a 10G wave to five regional TierPoint facilities. Certified SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, ITAR and Data Privacy Framework registered. Capacity is omitted: the only power figure the operator publishes is 'five redundant generators totaling 5.5 MW', which is backup generator nameplate, not IT load, and recording it as facility capacity would overstate the site. Directory listings associate this address with Cosentry, the regional provider TierPoint acquired; none of the cited sources states that, so it is noted rather than asserted. Coordinates are a street-address approximation. The record is marked reported (single source, the operator's own page).

Five redundant on-site generators totaling 5.5 MW with a minimum 48 hours of runtime — backup capacity, not IT load.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.