SOURCE-LINKED U.S. REGISTRY

Project Spero (TigerDC), Tyger River Industrial Park

TigerDC · , SC · United States

Facility record

Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
34.9109275, -82.092603
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Spartanburg County Council adopted a resolution backing the project in November 2025.

    Underlying source
  2. Cancelled

    TigerDC formally withdrew Project Spero from consideration in Spartanburg County after the council declined to offer tax incentives, stating that 'alignment has not been achieved' and that it would pursue alternative sites.

    Underlying source

Source notes

Proposed for Tyger River Industrial Park-North in Spartanburg County. Local coverage put the investment at roughly $3 billion, but the source consulted as of August 2026 describes it only as 'multibillion-dollar', so no investment figure is asserted here. Coordinates are an approximate geocode of the Tyger River Industrial Park area. Distinct from both Greenidge Spartanburg (tracked separately as of August 2026) and the NorthMark/Valara site. As of 2026-09-10, the record's cancelled status remains accurate. TigerDC formally withdrew Project Spero on 2026-02-27 after Spartanburg County Council declined to offer a tax incentive amid sustained public opposition; TigerDC said it will look at other, more receptive communities but no replacement SC site has been named.

TigerDC described a self-contained power strategy designed to avoid straining the local residential grid.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory