SOURCE-LINKED U.S. REGISTRY

TPC Konterra 1 Data Center

TPC Data Centers (TPC DC Mid-Atlantic LLC) · Laurel, MD · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
6201 Frost Place
Coordinates
39.09, -76.9
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
12 MW
Source record updated
2026-10-06

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.

Source notes

Powered-shell data center planned by TPC Data Centers (subsidiary of Twin Palms Capital Group) at 6201 Frost Place, Laurel, near the Burtonsville substation; 150,000 sq ft across two floors, year-planned 2027, claimed PUE of 1.1; company materials suggest potential expansion to 30MW across two sites totaling 160MW. Single-source trade coverage — confidence reported, not confirmed.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory