TPC Payson Data Center Campus
Twin Palms Capital (TPC Data Centers) · Payson, UT · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 40.0444, -111.7321
- Serving utility, source-reported
- Rocky Mountain Power
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-13
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
In city planning as of mid-2026, with first capacity targeted for about Nov 2027 to Q1 2028
Underlying source
Source notes
About 150,000 sq ft, two-level building on about 10 acres. No street address is published, and the location is approximate (Payson). The details are developer-provided via a directory listing.
TPC helped Payson fund a new 40 MW Rocky Mountain Power substation serving local load including this campus. The design includes an option for natural gas or hydrogen firming.
Sources and provenance
- Carrier-Neutral Data Center, Payson, UT (TPC) · source retrieved 2026-10-13
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.