SOURCE-LINKED U.S. REGISTRY

TPC Payson Data Center Campus

Twin Palms Capital (TPC Data Centers) · Payson, UT · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
40.0444, -111.7321
Serving utility, source-reported
Rocky Mountain Power
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-13

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    In city planning as of mid-2026, with first capacity targeted for about Nov 2027 to Q1 2028

    Underlying source

Source notes

About 150,000 sq ft, two-level building on about 10 acres. No street address is published, and the location is approximate (Payson). The details are developer-provided via a directory listing.

TPC helped Payson fund a new 40 MW Rocky Mountain Power substation serving local load including this campus. The design includes an option for natural gas or hydrogen firming.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.