SOURCE-LINKED U.S. REGISTRY

Buckeye Tech Corridor

Tract · Buckeye, AZ · United States

Facility record

Lifecycle
PermittedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.4136, -112.7203
Serving utility, source-reported
Arizona Public Service (APS)
Operational capacity, source-reported
Not published
Planned capacity, source-reported
1800 MW
Source record updated
2026-10-22

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Permitted

    Buckeye City Council terminated the prior Cipriani residential master plan and approved the Buckeye Tech Corridor rezoning.

    Underlying source

Source notes

Master-planned data center park on a ~2,069-acre former residential (Cipriani) parcel Tract acquired for ~$136M, south of I-10 in Buckeye; planned for up to ~20M sq ft across as many as 40 data centers at full build-out over ~15 years (~$20B). Coordinates are an approximate town-level geocode (Buckeye, south of I-10), not a parcel-confirmed point. The City of Buckeye executed a development agreement with AZLCO Buckeye, LLC (Ordinance No. 08-24, adopted unanimously 2024-08-06). It reimburses the developer for six enumerated regional infrastructure components it builds and dedicates to the city — two public-safety sites, temporary and permanent public-safety facilities, $15M toward the Johnson Road interchange, and oversized regional water infrastructure — funded by 20% of the tax revenue the project itself generates, beginning only after the city has received $60M cumulatively and terminating 20 years from the effective date. It is capped at "the lesser of" the developer's verified costs or $50,000,000, so it cannot exceed what the developer actually spent; it is cost recovery for public infrastructure rather than an incentive, abatement or credit, and is therefore not recorded as a subsidy. Nothing has been paid to date. Buckeye's economic-development director has projected "more than 360 jobs at full build out" — an end-state across as many as 40 separate future data centers, none yet leased, permitted or built, and so not recorded as a permanent-jobs figure for this site. A search of 226 Buckeye Council and P&Z agendas (Feb 2024 – Aug 2026) found no GPLET and no Foreign Trade Zone instrument.

Buckeye Tech Corridor is planned around a standard APS grid interconnect; APS is working to expand area power infrastructure to serve up to 1.8GW of demand.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.