SOURCE-LINKED U.S. REGISTRY

Peru Shelf Technology Park

Tract · , NV · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.545801, -119.497162
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
810 MW
Source record updated
2026-09-24

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Under construction

    Listed as under construction by Blackridge Research; Tract's own project page describes the campus as owned and in development with site energization in February 2027 and construction power available immediately.

    Underlying source

Source notes

Parcels range from 183 to 277 acres; zoned for by-right data center use with 125-foot building height allowances. Distinct from Tract's Peru Ridge (517 acres / 230 MW), South Valley (1,534 acres / 1,215 MW), Sapphire (1,063 acres / 700 MW, the Silver Springs campus) and Virginia Highlands (8,590 acres / 2,500 MW) projects. Coordinates are an OpenStreetMap Peru Drive road point, not a parcel-confirmed location.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory