SOURCE-LINKED U.S. REGISTRY

Project Range

Tract · Buckeye, AZ · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
33.435, -112.512
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-08-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Under review by Maricopa County planning staff; comprehensive plan amendment and rezoning requests in progress, no hearing dates scheduled as of this retrieval.

    Underlying source

Source notes

A Maricopa County island between Buckeye and Goodyear, on both sides of Yuma Road between Perryville Road and Jackrabbit Trail. Plan is 28 buildings across two campuses totalling about 5.6 million sq ft, individual buildings 149,000-260,000 sq ft, with roughly 100 acres set aside for parks and public uses and a 15+ year build-out. No MW figure disclosed. Distinct from Tract's tracked Buckeye Tech Corridor site, which is a separate ~1,700-acre holding inside the Buckeye city limits in the Cipriani area south of I-10 — the two neighbouring cities' formal objections to Project Range confirm it is not the campus they already entitled.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory