SOURCE-LINKED U.S. REGISTRY

Tract Virginia Highlands Technology Park

Tract · Lockwood, NV · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.5071009, -119.6464691
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
2500 MW
Source record updated
2026-09-24

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Tract lists the site as owned and in development: 8,590 acres across 11 parcels with 2,500 MW of planned capacity.

    Underlying source

Source notes

Land is positioned between the Tahoe-Reno Industrial Center and the Virginia City Highlands, just southeast of Lockwood, with parcels ranging from 250 to 1,200 acres and existing industrial zoning. This is a land-and-power park with no named tenant or building programme disclosed; the 2,500 MW is Tract's stated site capacity, not a built or contracted figure. Coordinates are the Lockwood reference point, not a parcel boundary. Distinct from Tract's Silver Springs / Sapphire site in Lyon County, which the tracker already carries. Public-reception check (2026-09-10): The 8,590-acre Storey County site (between the Tahoe-Reno Industrial Center and Virginia City Highlands, southeast of Lockwood) was already zoned industrial with data centers as a pre-approved use at acquisition (2024-06-18), consistent with Storey County/TRIC's long-standing industrial-friendly zoning posture. Checked: Tract's own project page and its 2024 acquisition press release -- neither mentions a public hearing, county-official statement, or any resident opposition/support specific to this parcel.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory