Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)
Turin Hoefler Avenue LLC · Ilion, NY · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 14 Hoefler Avenue
- Coordinates
- 43.0119, -75.0357
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 200 MW
- Source record updated
- 2026-10-26
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Redevelopment of the former Remington Arms firearms plant, which ceased production in 2024. WKTV: "Turin Hoefler Avenue LLC submitted a revised application" to the NYSDEC "Brownfield Cleanup Program" in January 2026 for "Site C," a "7.837-acre parcel," with a "250,000-square-foot AI data center" as the intended post-remediation use, at "14 Hoefler Ave., Ilion, NY"; the site has "widespread contamination in the soil, especially with heavy metals like arsenic, lead, and copper at levels above state cleanup standards for commercial use" and "15 vacant industrial buildings dating to the early 1900s," and the developer describes it as a "fossil-fuel-free, 100% electric site." The planned capacity of 200 MW comes from the Rockefeller Institute of Government's tracker entry for the project ("200 MW"), not from WKTV, which states no MW figure. County discrepancy: WKTV's article says Oneida County; the Rockefeller Institute says "Village of Ilion, Herkimer County." Ilion is in Herkimer County, so Herkimer is recorded and the WKTV attribution is treated as an error. The 7.837-acre figure is the Brownfield Site C parcel only; trade press describes a larger ~32-acre overall plant site and two 250,000 sq ft buildings, neither of which had been verified against a cited source as of September 2026, so neither is recorded. No permanent-jobs figure is recorded: the source says only that the project "aims to exceed the 274 positions lost when Remington closed," which is an aspiration, not a count. As of 2026-09-09, neither cited source states an investment figure, water/cooling detail, utility, or IDA or PILOT agreement. Because the site is fossil-fuel-free and 100% electric per the developer, no on-site generation is recorded.
Sources and provenance
- 250,000-Square-Foot AI Data Center Planned for Ilion's Remington Site C · source retrieved 2026-09-09
- Updates on the Cloud: More Moratoriums on Data Centers · source retrieved 2026-10-26
- Ilion data center moratorium vote tabled · source retrieved 2026-10-26
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.