SOURCE-LINKED U.S. REGISTRY

Valar Atomics / Nvidia Nuclear-Powered AI Data Center (Orangeville)

Valar Atomics · Orangeville, UT · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.2272, -111.0535
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
30 MW
Source record updated
2026-11-02

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Valar and Nvidia said they are considering a 30 MW data center powered by Valar's reactor

    Underlying source

Source notes

Early-stage: the companies are 'considering' the project, and the reactor needs an NRC license before it can sell commercial power. This would be a data center next to the tracked Ward 250 test reactor (valar-atomics-ward-250-orangeville-ut), which is a separate power_generation record. The pin is the Orangeville town point.

Behind-the-meter power from a Valar Ward-series helium-cooled reactor.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory