SOURCE-LINKED U.S. REGISTRY

Project Beehive

Valar Atomics · Price, UT · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
39.5994, -110.8107
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-13

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    BLM Utah confirmed it received Valar's application for more than 9,000 acres near Price. Utah Trust Lands approved a roughly 640-acre Carbon County lease on Sept 17, 2026.

    Underlying source

Source notes

More than 9,000 acres of BLM land near Price, under completeness review, plus about 640 acres of state trust land in Carbon County. Non-nuclear construction is targeted as early as the end of 2026 and first reactors in 2028. The location is approximate (Price). This is separate from Valar's Ward 250 test reactor at the San Rafael Energy Lab and from its withdrawn Green River BLM application.

Company documents reported by NPR describe about 456 small gas-cooled reactors totaling up to about 9.6 GW, plus nuclear fuel production and waste storage facilities.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory