ValorC3 Boise 2
ValorC3 Data Centers · Boise, ID · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 9601 W Emerald St
- Coordinates
- 43.60955, -116.30185
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 10 MW
- Source record updated
- 2026-10-04
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
ValorC3 announced a second Boise data center, targeting completion in 2027.
Underlying source - Under construction
ValorC3 closed a credit facility with Apterra Infrastructure Capital to continue building the greenfield Boise facility. The project is backed by a long-term lease with a major hyperscale technology company.
Underlying source
Source notes
A 38,000 sq ft building at 9601 W. Emerald St., next to Boise City Hall West. The City of Boise approved it, and it is valued at more than $20 million (BoiseDev, March 2026). No investment figure is recorded because that amount is a permit valuation, not total capital cost. The first phase provides 10 MW of 'AI-ready colocation and connectivity'. A preliminary application seeks a further ~31,000 sq ft expansion, likely to start before phase one is finished. The pin was geocoded from the street address with the US Census geocoder, which interpolates along address ranges. No AI classification is recorded: 'AI-ready' is marketing, not a stated AI workload.
Sources and provenance
- Boise data center is set to open next year. Before opening, owners just applied to nearly double it (archived) · source retrieved 2026-10-04
- ValorC3 plans second Boise data center for 2027 · source retrieved 2026-10-04
- ValorC3 lands financing for 10MW Boise data center · source retrieved 2026-10-04
- ValorC3 Data Centers Eyes Idaho Expansion · source retrieved 2026-10-04
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.