Vantage Frontier Campus
Vantage Data Centers · , TX · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.7272, -99.2987
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1400 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Vantage announces Frontier: $25B mega-campus on 1,200 acres at Hwy 604 / Hwy 351 intersection; ~125 miles W of Fort Worth
Underlying source - Proposed
OpenAI, Oracle and SoftBank name Shackelford County, Texas, as a new Stargate site; the announcement does not name Vantage.
Underlying source - Under construction
Vantage broke ground on Frontier, "a major expansion tied to Oracle and OpenAI's Stargate initiative"; the first facility is scheduled to enter service in the second half of 2026 (a target, not a delivery), with 10 buildings totalling 3.7M sq ft.
Underlying source - Under construction
Cleanview's reading of satellite imagery: vertical construction underway on five buildings, with foundations laid for two more.
Underlying source
Source notes
Off-grid, behind-the-meter natural gas microgrid (~210 industrial gas generators, 700 MW) built and managed by VoltaGrid, bypassing multi-year ERCOT interconnection queues. No grid utility connection.
Sources and provenance
- Vantage Data Centers Unveils Plans for Frontier, a $25B Mega-campus in Texas — Vantage · source retrieved 2026-07-05
- Vantage breaks ground on Texas gigawatt data center campus for OpenAI — Data Center Dynamics · source retrieved 2026-07-05
- Oracle and OpenAI Texas data center to run on 700MW natural gas microgrid · source retrieved 2026-07-06
- Vantage Shackelford County, TX campus · source retrieved 2026-07-06
- Data center plans move forward in Shackelford County · source retrieved 2026-07-06
- OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites · source retrieved 2026-10-16
- Vantage Data Centers breaks ground on data center campus in Texas · source retrieved 2026-10-16
- Stargate Frontier · source retrieved 2026-10-16
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.