Vantage Data Centers OH2 (Millersport Campus)
Vantage Data Centers · Millersport, OH · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 39.902, -82.5324
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 696 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Vantage's second Ohio campus (distinct from the tracked OH1 in Johnstown), at Lancaster-Newark Rd & Blacklick Rd near Millersport — up to 7 structures incl. 4 data-center buildings, $2.1B, powered by an adjacent natural-gas generation facility; under construction as of mid-2026. Capacity figures diverge: 696 MW on Vantage's own site (used here) vs ~800 MW / 500 acres on a project aggregator — the operator figure is used and the discrepancy flagged. Coordinates approximate (Millersport city-center, not parcel-verified). Public-reception check (2026-09-10): Checked the project's own campus microsite (2026-09-10); it covers only project description and planned economic benefits, with no documented public hearing, resident reaction, or official statement of support/opposition.
Sources and provenance
- Vantage Millersport Campus official site: 352 acres, 696 MW IT capacity, 7 structures (up to 4 data centers), Lancaster-Newark Rd & Blacklick Rd, adjacent natural-gas power, $2.1B+ · source retrieved 2026-08-05
- Powered By Who dossier: ~39.90N/-82.53W city-center pin (no exact address), 500 acres / 800 MW figures, 'under construction' as of 2026-06 · source retrieved 2026-08-05
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.