Vantage Quincy WA11
Vantage Data Centers · Quincy, WA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- 2101 M Street NE
- Coordinates
- 47.2501646, -119.8144903
- Serving utility, source-reported
- PUD No 2 of Grant County
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
2101 M Street NE, Quincy, Grant County WA; WA1 campus with WA11/WA12/WA13 buildings. As of October 2026, Vantage's campus page states 89MW of critical IT load for the whole three-building campus and gives no figure for WA11 alone, so no operational capacity is recorded for this building; Vantage's October 2023 release says the WA13 building adds 64MW of that campus total.
Vantage says Grant County PUD's two large-scale hydroelectric dams produce an average of 1,050 MW annually and that hydro is more than 66% of the utility's generation mix; it markets GCPUD as offering the lowest per-kW rates in the country.
Sources and provenance
- Vantage facility directory · source retrieved 2026-09-21
- OpenStreetMap way/337127817 · source retrieved 2026-07-22
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- Vantage Data Centers Completes Development of 89MW, $1 Billion Quincy, Washington Campus · source retrieved 2026-09-05