Vantage WA13

Vantage Data Centers · Quincy, WA · United States

Facility record

Lifecycle
OperationalSource-reported lifecycle
Location precision
approximate
Address as listed
2101 M Street NE
Coordinates
47.247, -119.83
Serving utility, source-reported
Grant County PUD
Operational capacity, source-reported
64 MW
Planned capacity, source-reported
Not published
Source record updated
2026-09-05

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Operational

    Vantage announced delivery of WA13, the third and final facility on its Quincy (WA1) campus.

    Underlying source

Source notes

530,000 sq ft building adding 64 MW of IT capacity on Vantage's 68-acre Quincy (WA1) campus at 2101 M Street NE, bringing the campus to 89 MW across nearly 775,000 sq ft. Uses Tier 4 generators to reduce particulate and NOx emissions. Construction began in late 2022 and the building was delivered Oct. 18, 2023. Sibling buildings WA11 and WA12 are tracked separately as of September 2026; the 89 MW and 68 acres are campus-level figures and are not attributed to this building. Coordinates are an approximate geocode of the campus address.

Vantage says Grant County PUD's two large-scale hydroelectric dams produce an average of 1,050 MW annually and that hydro accounts for more than 66% of the utility's generation mix.