Vines Rest Data Center (BPA L0704)
Savion (Shell Energy subsidiary), per BPA application documents · Alderdale (vicinity), WA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 45.8349586, -119.9208683
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
BPA load interconnection request L0704 (1,000 MW) received July 27, 2026; Phase 1 scoping.
Underlying source
Source notes
The queue record places the site east of Alderdale, bounded by Columbia Ridge Road, Sonova Road and Highway 14, on land owned by Columbia Ridge Orchards LLC. It would interconnect on the McNary–John Day No. 1 and No. 2 500 kV lines. A Savion spokesperson said 'there is currently no defined Vines Rest project.' A queue position is not an approval. Coordinates are the Alderdale locality point.
Sources and provenance
- More data centers possible for county · source retrieved 2026-10-30
- Rural Klickitat County faces surge in data center proposals · source retrieved 2026-10-30
- OpenStreetMap Nominatim geocode: Alderdale, WA (representative point) · source retrieved 2026-10-30
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.