SOURCE-LINKED U.S. REGISTRY

APECS Data Center Campus (Former GM Assembly Plant)

Viridian Acquisitions LLC · Janesville, WI · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
42.66331, -89.02056
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
800 MW
Source record updated
2026-08-18

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Janesville City Council voted 5-2 to approve a non-binding letter of intent, opening a 120-day negotiation window with Viridian.

    Underlying source

Source notes

Redevelopment of the 250-acre former General Motors assembly plant (demolished 2019), a DNR-cleanup brownfield. Two configurations are under evaluation: an 11-building data center campus or an 8- or 9-building hyperscale campus, drawing up to 800 MW. Utility is Alliant Energy. The end user has not been disclosed. Coordinates are the geocoded former GM plant site, not a parcel-confirmed footprint.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory