Energy Generation and Technology Campus
W Holdings · Maricopa, AZ · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 32.945, -112.035
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Pinal County Board of Supervisors unanimously approved the major comprehensive plan land-use amendment; rezoning still required.
Underlying source
Source notes
Located south of the City of Maricopa, east of State Route 347 and west of the Nissan test track, abutting the southern boundary of the Ak-Chin Indian Community. Investment is recorded as the itemized $4B construction plus $5.5B equipment figure presented to the Planning and Zoning Commission; a separate report rounds the total to $10B. Acreage is also reported as 500 and, in one account, 656 acres. Some coverage associates the site with Copia Power; the applicant of record in commission and board coverage is W Holdings, represented by the same attorney who has appeared for Copia projects, so the corporate relationship is not established here.
Plan pairs data centers with an on-site natural gas power plant and battery energy storage. The applicant told the commission the campus would be powered primarily by the Griffin Energy Project (solar, gas and battery). No MW figure has been stated publicly.
Sources and provenance
- $10 billion data center campus OK'd south of Maricopa · source retrieved 2026-08-28
- Commission Recommends Data Center Campus Despite Resident, Tribal Pushback · source retrieved 2026-08-28