Willow Lakes Data Center (West Midway Road)
Willow Lakes LLC (end operator undisclosed) · Fort Pierce, FL · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- West Midway Road
- Coordinates
- 27.3742, -80.4104
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-02
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
Willow Lakes LLC filed a rezoning application in June 2026 to convert 174 of a 203-acre parcel at West Midway Road and I-95 from its current designation to light industrial for a data center (the remaining 26 acres would go general commercial for retail/hotel/gas station uses; the article's 174 and 26 acres add to 200, three fewer than the 203 acres it gives for the owner's land). The application states intent to bring in an unnamed partner company to develop and operate the facility; it cites existing FPL transmission lines crossing the site and an existing man-made lake floated as a potential closed-loop cooling source. Scheduled before the St. Lucie Planning and Zoning Board on September 17, 2026 as of the article date. The parcel was previously entitled for the since-abandoned Koa Bay Surf Park. No capacity, investment, or job figures were stated in the source. Coordinates corrected 2026-09-10: an earlier draft shared a pin with Sentinel Grove Technology Park (Project Jarvis) that sat about 10 km from this parcel. This pin is the West Midway Road / I-95 crossing the source names, derived from OpenStreetMap geometry (Midway Road runs east-west at latitude 27.3742 and I-95 crosses it at longitude -80.4104); the pin is approximate because no parcel or house number was published. Distinct from Atlas Compute AI Data Center Campus, which lies roughly 8 km northeast: Atlas Compute announced land and utilities already secured in November 2025, whereas this application states the applicant has yet to name or agree terms with a partner company as of August 2026, and this parcel was previously entitled for the abandoned Koa Bay Surf Park rather than sited in Midway Industrial Park.
Sources and provenance
- New data center proposed for western St. Lucie County near Interstate 95 · source retrieved 2026-09-10
- Nominatim geocode of the roads the sources name (Minute Maid Road, Orange Avenue/SR 68, West Midway Road, Saint Lucie County FL); the Minute Maid Rd/Orange Ave intersection node and the West Midway Rd/I-95 crossing longitude were then read from OpenStreetMap way geometry via the Overpass API · source retrieved 2026-09-10
- Florida data center developers table request amid protest, for now · source retrieved 2026-10-02
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.