Wintersburg 313
313 Wintersburg LLC and Wintersburg Four LLC · Tonopah, AZ · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 33.472, -112.911
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-08-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Maricopa County Planning and Zoning Commission voted 7-0 to recommend approval of comprehensive plan amendment CPA250011 (Community Retail Center to Industrial in the Tonopah/Arlington Area Plan) and zone change Z250034 (Rural-43 to IND-3 IUPD); placed on the June 10, 2026 Board of Supervisors consent agenda.
Underlying source
Source notes
Northwest corner of Encanto Boulevard and Wintersburg Road in the Tonopah area. Data center use is established by the zoning conditions themselves, which set data-center-specific loading (1 space per 250,000 sq ft) and parking (1 space per 5,000 sq ft) standards. Conditions also require at least 20 acres preserved for commercial development and an archaeological/historical review filed with the Arizona State Historic Preservation Office before ground disturbance. Total acreage is not stated in the agenda text; recorded status reflects the commission recommendation, not a confirmed Board vote.
Zoning conditions set a 150-foot maximum height for energy production structures and exclude solar panels, battery energy storage containers and ancillary electric generation structures from lot-coverage calculations, indicating on-site solar and storage alongside the data center use. No MW figures in the case record.
Sources and provenance
- Maricopa County Board of Supervisors' Hearing Planning and Zoning Agenda, June 10, 2026 (cases CPA250011 and Z250034, Wintersburg 313) · source retrieved 2026-08-28
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.