Wise Innovation Hub (OASIS)
Wise Innovation Hub Venture LLC · , VA · United States
Facility record
- Lifecycle
- ProposedSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 36.99, -82.53
- Serving utility, source-reported
- Not established
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-10-28
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Wise Innovation Hub Venture executed an LOI with Red Post Energy Group for phased power infrastructure
Underlying source
Source notes
Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power. As of July 2026, named end-users had not been disclosed. Cardinal News (February 2026) reports nine data-center buildings of about 240,000 sq ft each, each needing about 50 MW of power, with on-site gas generation that could scale to 500 or 600 MW. As of October 2026, no cited source states a total data-center capacity, so none is recorded.
To be served by the phased Maverick Project developed by Red Post Energy Group. Red Post Energy's December 2025 announcement (PR Newswire) describes the project site as having "a planned capacity of up to 600 megawatts (MW), with an initial development phase of approximately 100 MW", with onsite natural gas-fired generation among the power supply options to be evaluated. Virginia Business (April 2026) reports that Red Post Energy is studying whether powering the project with hydrogen is feasible. Because 600 MW is a planned ceiling, no on-site generation figure is recorded.
Sources and provenance
- Data center complex with gas power plant planned for Wise County · source retrieved 2026-08-16
- Data center developers seek on-site energy in Wise · source retrieved 2026-07-13
- Data Centers — Wise County Economic Development · source retrieved 2026-07-13
- Red Post Energy and Wise Innovation Hub Venture (OASIS) Execute Letter of Intent to Advance Power Infrastructure for Major Data Center Development in Southwest Virginia · source retrieved 2026-09-09
- Wise County considers new gas infrastructure for data center project · source retrieved 2026-09-09
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.