SOURCE-LINKED U.S. REGISTRY

Wise Innovation Hub (OASIS)

Wise Innovation Hub Venture LLC · , VA · United States

Facility record

Lifecycle
ProposedSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
36.99, -82.53
Serving utility, source-reported
Not established
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-28

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    Wise Innovation Hub Venture executed an LOI with Red Post Energy Group for phased power infrastructure

    Underlying source

Source notes

Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power. As of July 2026, named end-users had not been disclosed. Cardinal News (February 2026) reports nine data-center buildings of about 240,000 sq ft each, each needing about 50 MW of power, with on-site gas generation that could scale to 500 or 600 MW. As of October 2026, no cited source states a total data-center capacity, so none is recorded.

To be served by the phased Maverick Project developed by Red Post Energy Group. Red Post Energy's December 2025 announcement (PR Newswire) describes the project site as having "a planned capacity of up to 600 megawatts (MW), with an initial development phase of approximately 100 MW", with onsite natural gas-fired generation among the power supply options to be evaluated. Virginia Business (April 2026) reports that Red Post Energy is studying whether powering the project with hydrogen is feasible. Because 600 MW is a planned ceiling, no on-site generation figure is recorded.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.