Aligned IAD-03
Aligned Data Centers · Ashburn, VA · United States
Facility record
- Lifecycle
- OperationalSource-reported lifecycle
- Location precision
- exact
- Address as listed
- Not published
- Coordinates
- 38.9886354, -77.4407776
- Serving utility, source-reported
- Dominion Energy VirginiaView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- Not published
- Source record updated
- 2026-09-01
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
No dated operational history is established in this record. Publication, discovery and source-update dates are not opening dates.
Source notes
IAD-03 confirmed via Aligned's own location page; 430,000 sq ft, 72MW, phase one delivered Fall 2023. AI/HPC (likely): Sterling IAD-03 supports high/variable-density AI/HPC.
Aligned's Ashburn campus connects to the Dominion Energy Virginia grid; Dominion offers green-energy program options but no site-specific dedicated generation or PPA was found for IAD-03 specifically.
Sources and provenance
- Aligned facility directory · source retrieved 2026-07-22
- OpenStreetMap way/1276518684 · source retrieved 2026-07-22
- Aligned AI/HPC — Sterling IAD-03 supports high/variable-density AI/HPC · source retrieved 2026-09-01
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- datacenters.com — Aligned Energy IAD01/IAD02 Ashburn · source retrieved 2026-07-24
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.