CleanArc VA1
CleanArc Data Centers · Ruther Glen, VA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 37.9374, -77.4837
- Serving utility, source-reported
- Dominion Energy VirginiaView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 900 MW
- Source record updated
- 2026-10-22
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
CleanArc broke ground on its 900 MW flagship campus in Ruther Glen, Caroline County; first 300 MW online targeted 1Q 2027, phased to mid-2030s
Underlying source
Source notes
900 MW flagship campus in Ruther Glen, Caroline County, phased into the mid-2030s (the November 2025 groundbreaking release targets the first 300 MW online in 1Q 2027; an earlier Data Center Dynamics report had said 200 MW by Q3 2026). Distinct operator/parcel from the AWS Mattermeade campus (also Caroline County). Coordinates are the Ruther Glen area centroid. The recorded investment is the confirmed $3B first-phase pledge (VEDP); the ~$8.8B full-buildout figure is a projection and is excluded.
Dominion Energy Virginia is the sole investor-owned utility serving Caroline County (attribution via SCC territory; not named directly in CleanArc materials). 900 MW phased in three 300 MW stages (2027 / 2030 / 2033-2035); the VA SCC approved a large-load rate class in Nov 2025. CleanArc markets a 'True Additionality' clean-energy model; no confirmed on-site generation.
Sources and provenance
- CleanArc gets green light for data center campus in Caroline County, Virginia · source retrieved 2026-07-07
- CleanArc Data Centers invests $3 billion in Caroline County · source retrieved 2026-07-08
- CleanArc Data Centers breaks ground on 900MW flagship campus in Virginia · source retrieved 2026-07-08
- VA DEQ air permit 74341-1 — Clean Arc Data Centers VA-1 Campus (issued 2026-07-02) · source retrieved 2026-07-29
- Submission provenance (not controlling source) — Public Evidence record for permit 74341-1 · source retrieved 2026-07-30
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.