CloudHQ Manassas MCC Campus
CloudHQ · Manassas, VA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 38.7196, -77.4982
- Serving utility, source-reported
- Dominion Energy (Clover Hill substation)View utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 382 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
Seven-building, 2.2 million sq ft campus planned south of Routes 28 and 234 intersection in Manassas
Underlying source - Under construction
MCC7 construction commenced mid-2025 (expected RFS Q3 2026); MCC5 site-plan approved and ready for development
Underlying source
Source notes
Seven-building campus; 382 MW total planned critical IT load; 96 MW currently available. Coordinates sourced directly from CloudHQ website (38.71955, -77.49819). Connects via Manassas Fiber Highway to CloudHQ's MDC campus.
Served via Dominion Energy's Clover Hill substation (300 MVA); a local distribution cooperative is reported to supply part of the campus. On-site backup is diesel only (28 generators at the first building).
Sources and provenance
- CloudHQ MCC Campus — Manassas, Virginia · source retrieved 2026-07-06
- CloudHQ Unveils Massive New Manassas Data Center — Data Center Frontier · source retrieved 2026-08-16
- Prince William County Planning Commission — MCC-7 proffer amendment (REZ2024-00025) · source retrieved 2026-07-06
- Legal battle over Prince William Digital Gateway data-center campus — WJLA · source retrieved 2026-07-06
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.