SOURCE-LINKED U.S. REGISTRY

Culpeper Acquisitions Brandy Station Campus (denied)

Culpeper Acquisitions LLC · Brandy Station, VA · United States

Facility record

Lifecycle
CancelledSource-reported lifecycle
Location precision
approximate
Address as listed
Not published
Coordinates
38.5095, -77.8863
Serving utility, source-reported
Dominion EnergyView utility impact evidence
Operational capacity, source-reported
Not published
Planned capacity, source-reported
Not published
Source record updated
2026-10-30

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    $12B, 426-acre hyperscale campus proposed; end user not publicly confirmed (reported possibly Google or Meta)

    Underlying source
  2. Cancelled

    Unanimously denied by Culpeper County Planning Commission; concerns over rural preservation and proximity to Culpeper Battlefields State Park

    Underlying source

Source notes

Grid-only proposal. County/PEC documents state Dominion Energy is obligated to supply power and would need a new large substation and 2-5 miles of new transmission line for the 700MW-1.8GW load. No on-site or dedicated generation is proposed; no REC (Rappahannock Electric Cooperative) role is mentioned.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory