DataBank Culpeper Campus (IAD5 / IAD6)
DataBank · Culpeper, VA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- 14601 Germanna Highway
- Coordinates
- 38.4492071, -77.9821013
- Serving utility, source-reported
- Dominion EnergyView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 192 MW
- Source record updated
- 2026-10-14
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Proposed
DataBank announced an 85-acre Culpeper campus of up to three 2-story data centers (1.4M gross sq ft).
Underlying source - Under construction
Baxtel lists IAD5 as a new facility under construction, with a 2027 target.
Underlying source
Source notes
Located in the Culpeper Technology Zone. The under-construction status rests on the Baxtel listing, and Virginia Business (Aug 2024) said the first facility was expected online around 2027–2028. The address comes from the Baxtel listing.
A 300 MW onsite Dominion substation would deliver 192 MW of critical IT power when fully deployed.
Sources and provenance
- DataBank chooses Culpeper County · source retrieved 2026-10-14
- DataBank: IAD5 · source retrieved 2026-10-14
- Culpeper tech zone attracts data centers · source retrieved 2026-10-14
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.