SOURCE-LINKED U.S. REGISTRY

DataBank Culpeper Campus (IAD5 / IAD6)

DataBank · Culpeper, VA · United States

Facility record

Lifecycle
Under constructionSource-reported lifecycle
Location precision
approximate
Address as listed
14601 Germanna Highway
Coordinates
38.4492071, -77.9821013
Serving utility, source-reported
Dominion EnergyView utility impact evidence
Operational capacity, source-reported
Not published
Planned capacity, source-reported
192 MW
Source record updated
2026-10-14

Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.

Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.

Reported lifecycle history

  1. Proposed

    DataBank announced an 85-acre Culpeper campus of up to three 2-story data centers (1.4M gross sq ft).

    Underlying source
  2. Under construction

    Baxtel lists IAD5 as a new facility under construction, with a 2027 target.

    Underlying source

Source notes

Located in the Culpeper Technology Zone. The under-construction status rests on the Baxtel listing, and Virginia Business (Aug 2024) said the first facility was expected online around 2027–2028. The address comes from the Baxtel listing.

A 300 MW onsite Dominion substation would deliver 192 MW of critical IT power when fully deployed.

Sources and provenance

Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.

Back to map & directory