Project Boulder
Eagle Rock Partners · , SC · United States
Facility record
- Lifecycle
- CancelledSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Cooks Hill Road
- Coordinates
- 32.7, -80.62
- Serving utility, source-reported
- Dominion Energy South CarolinaView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 1000 MW
- Source record updated
- 2026-10-30
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Cancelled
The Post and Courier reported on October 7, 2026 that Eagle Rock Partners abandoned this plan for a different Colleton County site; the abandonment date is not stated.
Underlying source
Source notes
Near the ACE Basin (Ashepoo-Combahee-Edisto estuary). Would be South Carolina's first gigawatt-scale data center if built; speculative, no named tenant. Coordinates are approximate.
Grid-delivered, tied to a specific but unbuilt regional gas plant — not on-site/behind-the-meter generation.
Sources and provenance
- Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians · source retrieved 2026-07-09
- HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage) · source retrieved 2026-07-23
- News From The States (Yahoo mirror) — Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians · source retrieved 2026-07-24
- Who will pay to run the Colleton County data center? · source retrieved 2026-09-10
- Proposed Data Center Campus in Colleton County · source retrieved 2026-09-10
- Settlement protects sensitive ACE Basin from data center development in Colleton County (October 7, 2026) · source retrieved 2026-10-30
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.