Hanover Technology Park
Tract · , VA · United States
Facility record
- Lifecycle
- Under constructionSource-reported lifecycle
- Location precision
- approximate
- Address as listed
- Not published
- Coordinates
- 37.81, -77.47
- Serving utility, source-reported
- Dominion EnergyView utility impact evidence
- Operational capacity, source-reported
- Not published
- Planned capacity, source-reported
- 2400 MW
- Source record updated
- 2026-09-10
Source-reported capacity; not metered consumption. Review underlying documents and notes. Planned capacity may include future phases and is not added to operational capacity here. The source may use facility, grid-feed or IT capacity definitions; consult the linked documents.
Coordinate precision is a source label, not an independent parcel survey. A marker does not confirm utility territory or establish an effect on residential bills.
Reported lifecycle history
- Under construction
Secured zoning approval in 2024; Richmond BizSense reported in June 2026 that Tract 'is underway on construction of a 1,200-acre campus near Ashland'. Tract's own project page lists the site as 'Owned & In Development'.
Underlying source
Source notes
1,211 total acres in five parcels ranging from 153 to 318 acres, north of the Town of Ashland along the I-95 corridor, zoned M-1 Limited Industrial for by-right data center use with up to 110-foot building heights. Distinct from the two Tract records already tracked: the cancelled Mountain Road Technology Park (western Hanover, denied May 2026) and Tuckahoe Technology Park in Goochland. Coordinates are an approximate geocode north of Ashland, not a parcel-confirmed point. Public-reception check (2026-09-10): Checked Tract's own project page (2026-09-10); it lists only acreage, capacity, and zoning/utility specifications with no mention of public hearings, rezoning votes, resident opposition, or support. No community-reception record found in this source.
Operator states up to 2,400 MW across 8 substations; the site contains an existing utility transmission corridor and a natural gas pipeline.
Sources and provenance
- Hanover — Tract (operator project page) · source retrieved 2026-08-27
- One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax (archived) · source retrieved 2026-08-27
Power Wars capture: 2026-11-02. Compute Atlas, CC BY 4.0. Entries are not independently verified by Power Wars unless stated.